Pudong
International Airport
Project Phase I of Pudong International Airport started
officially in Oct. 1997 and completed in Sep. 1999.
Project Phase I has one 4E South-north runway (4000m×60m),
two parallel taxiways, 800,000 m2 apron, seventy-six
aircraft positions, 50,000m2 cargo warehouse, and also
equipped with the system of navigation,communication,
surveillance, weathering and logistics service etc.
It is capable of providing 24-hour round service.
The terminal building of Pudong International Airport
is composed of two parts, i.e. main building and long
terminal concourse, both 3-storey structured, and connected
by twopassages. The building covers an area about 280,000
m2, with thirteen conveying luggage belts and twenty-eight
boarding bridges; the area of food & drinks facilities
and other leasing service facilities reaches 60,000
m2.
  |
Currently, Pudong International Airport
has accommodated an average aircraft movements over
400 times per day, already accounting for approx. 60%
of the total aircraft movements of Shanghai. And it
is serving for about 50 domestic and foreign airlines,
connecting with over 70 international and regional destinations
and 60 domestic destinations.
|